Site Readiness Checklist for Paint Cell Projects
Content trust and applicability
Author
PaintCell
Publisher
Shanghai Tudou Technology Co., Ltd. | Shanghai, China
Contact
engineering@tdpaint.comScope
Planning tools and templates for feasibility, RFQ preparation, site readiness review, and investment screening.
Best used for
Best used to surface constraints early and align engineering, operations, procurement, and management before detailed design.
Use with caution
Outputs are reference-only and should be validated through detailed process review, layout work, coating trials, and commercial clarification.
Evidence basis
Assumptions reflect typical TD pre-engineering workflows, scope reviews, and project planning ranges.
A short checklist to confirm whether your site constraints are known before committing to a paint cell design. Confirming these items early prevents schedule and compliance surprises.
Checklist
| Item | Owner | Status |
|---|---|---|
| Space/clearances confirmed | _____ | ☐ |
| Booth/room defined | _____ | ☐ |
| Exhaust capacity known (or to be measured) | _____ | ☐ |
| Makeup air plan known | _____ | ☐ |
| Utilities available (power/air) | _____ | ☐ |
| Paint storage/handling routine defined | _____ | ☐ |
| Waste handling route defined | _____ | ☐ |
| Grounding/static requirements known | _____ | ☐ |
| EHS approval owner and process defined | _____ | ☐ |