Site Readiness Checklist for Paint Cell Projects

Content trust and applicability

Author
PaintCell
Publisher
Shanghai Tudou Technology Co., Ltd. | Shanghai, China
Scope

Planning tools and templates for feasibility, RFQ preparation, site readiness review, and investment screening.

Best used for

Best used to surface constraints early and align engineering, operations, procurement, and management before detailed design.

Use with caution

Outputs are reference-only and should be validated through detailed process review, layout work, coating trials, and commercial clarification.

Evidence basis

Assumptions reflect typical TD pre-engineering workflows, scope reviews, and project planning ranges.

A short checklist to confirm whether your site constraints are known before committing to a paint cell design. Confirming these items early prevents schedule and compliance surprises.

Checklist

ItemOwnerStatus
Space/clearances confirmed_____
Booth/room defined_____
Exhaust capacity known (or to be measured)_____
Makeup air plan known_____
Utilities available (power/air)_____
Paint storage/handling routine defined_____
Waste handling route defined_____
Grounding/static requirements known_____
EHS approval owner and process defined_____