Paint Cell RFQ Spec Template (Robotic Spray Painting)
Content trust and applicability
Author
PaintCell
Publisher
Shanghai Tudou Technology Co., Ltd. | Shanghai, China
Contact
engineering@tdpaint.comScope
Planning tools and templates for feasibility, RFQ preparation, site readiness review, and investment screening.
Best used for
Best used to surface constraints early and align engineering, operations, procurement, and management before detailed design.
Use with caution
Outputs are reference-only and should be validated through detailed process review, layout work, coating trials, and commercial clarification.
Evidence basis
Assumptions reflect typical TD pre-engineering workflows, scope reviews, and project planning ranges.
This RFQ template helps you collect the minimum information needed for a paint cell feasibility and scope review. It is not a pricing form; it reduces rework by making constraints explicit.
What it includes
- •Part information and presentation constraints
- •Finish targets and acceptance criteria
- •Throughput, shift pattern, and changeover expectations
- •Paint handling routine (liquid paint)
- •Site constraints and EHS validation owner
Copy/paste RFQ template
Project context
• Plant / site location (country/region):
• Primary application / part family:
• Current process (manual / semi / other):
• Target timeline (rough):
Part information
• Part photos or CAD link:
• Key dimensions and weight:
• Material and surface condition:
• How the part is presented/fixtured today:
Finish target
• Target finish: (appearance / functional coverage)
• Film build target (if known) + tolerance:
• Acceptable touch-up level (none / minimal / acceptable %):
• Current defect/rework drivers:
Throughput
• Required takt or parts/hour:
• Shifts per day and operating hours:
• Peak vs average demand (if relevant):
Changeover
• Changeover frequency: (per shift/day/week)
• Typical batch size:
• Cleaning expectations and acceptable downtime:
Paint (liquid) & routine
• Paint type: (liquid paint)
• Mixing/refill routine owner (operator / other):
• Any special handling constraints (if applicable):
Site constraints
• Booth/room dimensions (if known):
• Exhaust / ventilation info (if known):
• Available utilities (power/air):
• Space/clearance constraints:
Safety & validation
• Facility EHS requirements owner/contact:
• Required standards or facility policies (if known):
• Approval pathway and expected review cycle: